|
| image = 魏公村站站台.jpg | image_width = 265px | image_alt = | caption = | type = Rapid transit | system = Beijing Subway | status = Operational | locale = Haidian, Xicheng, Xuanwu & Fengtai | start = Anheqiao North | end = Gongyixiqiao | stations = 24 | routes = | ridership = 1,187,000 (2014 Avg. Line 4 only)〔http://www.mtr.bj.cn/en/content/details34_11664.html〕 1,574,000 (2014 Peak Line 4 only) | ridership2 =351 million (2012 annual)〔(【引用サイトリンク】publisher=北京市发展与改革委员会 )〕 | open = September 28, 2009 | close = | owner = | operator = Beijing MTR Corporation Limited | character = | depot = Longbeicun, Majiapu | stock = | linelength = | tracklength = | notrack = | gauge = | el = 750 V DC, third rail | speed = | elevation = | website = | map = | map_state = collapsed }} Line 4 of the Beijing Subway () is the 9th subway line in Beijing's mass transit network. It entered into operation on September 28, 2009,〔(Chinese) ("北京地铁4号线9月28日开通" ) Sept. 28, 2009〕 and runs from north to south, parallel and to the west of Line 5, through Haidian, Xicheng, Xuanwu and Fengtai Districts in the western half of the city. It is 28.2 km long with 24 stations.〔(Chinese) ("地铁四号线通过验收" ''北京晚报'' ) Sept. 25, 2009〕 Riding on this line starts from a fare of RMB(¥) 3.00 depending on the distance travelled. Line 4's color is teal. Line 4 and Daxing Line operate as a single line although they are classified as separate lines.〔("北京地铁4号线今年年底将与大兴线贯通运营" ) news.china.com.cn. Retrieved 4 July 2010.〕 ==Hours of operation== The first south-bound trains departs from Anheqiao North at 5:00am. The first north-bound train departs from Gongyixiqiao at 5:10am. The last north-bound train leaves Anheqiao North at 10:45pm. The last south-bound train leaves Gongyixiqiao at 11:10pm.〔(【引用サイトリンク】title=Line 4 timetable )〕 Each train completes the entire journey in 48 minutes. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 4, Beijing Subway」の詳細全文を読む スポンサード リンク
|